Synygy - Turbine Hall Renovation

  • This was a large open space, about 200′ long, 80′ wide with a 60′ high ceiling
  • We demolished an existing double wall
  • We did extensive core drilling and cut hundreds of feet of channel in the floor for electrical and data
  • The electrical and data requirements were significant
  • We constructed offices and conference rooms at both ends of the space
  • We installed custom made dry-erase boards in all of the conference rooms
  • We removed some of the heaters from the exterior walls and re-installed them on the new interior walls
  • All new air conditioning was installed and distributed through exposed spiral ducts
  • The center area was set up for an open office area for 80 people
  • All new carpet tile flooring was installed throughout (even on top of the new offices and conference rooms)