Optymyze - Cafeteria

  • This work was performed evenings and weekends
  • We removed all of the cabinetry and appliances and install a new ceramic floor
  • We installed a new ceramic backsplash
  • New counter tops were installed
  • We replaced the lighting
  • We gave everything a fresh coat of paint
  • Finally, we installed three TVs as menu boards