1881 House Restoration

  • The interior needed total renovation.
  • The owner asked us to restore the exterior of the house as it was in 1881.
  • We lowered the basement floor 24”, waterproofed and damp proofed.
  • We built and two-story addition and a covered deck on the rear of the house.
  • The entire house was re-roofed with shingles and standing seam.
  • We installed all new electrical, plumbing and HVAC throughout.
  • The entire house was brough up to current standards and Codes.
  • Finally, we painted the exterior.
© Copyright 2024 GBR Construction, Inc. Developed by TAF JK Group, Inc.